Fuso last of the cardboard
Hi All
This is the last of the cardboard parts added the crane pole behind the tower, the last of the seaplanes and the pulleys on the after tower. Modified the aft mast to be the correct diameter.
Seaplanes and crane boom and the pole to hold up the diving board.
Pulley system I assume this is for moving the boats but I would be grateful if someone would tell me how it works, also do the side cranes rise hydraulically to swing the boats out.
Has anyone seen a good picture of Fuso's rigging please?
@jim your occasional large one on the link below.
http://homepage.ntlworld.com/ccompro/fuso/fuso_334.JPG
barry
Hi All
This is the last of the cardboard parts added the crane pole behind the tower, the last of the seaplanes and the pulleys on the after tower. Modified the aft mast to be the correct diameter.
Seaplanes and crane boom and the pole to hold up the diving board.
Pulley system I assume this is for moving the boats but I would be grateful if someone would tell me how it works, also do the side cranes rise hydraulically to swing the boats out.
Has anyone seen a good picture of Fuso's rigging please?
@jim your occasional large one on the link below.
http://homepage.ntlworld.com/ccompro/fuso/fuso_334.JPG
barry