A lot of you know handlay a lot of my turnouts. I am faced with having to install two turnouts in street trackage. Somewhere in the cobwebs of my mind I seem to remember that some industrial switches use only one point. I would like to see if anyone can point me(haha) to information on this. One of the things I think ruins the appearance of model railroads I've seen with switches in pavement has been the wide gaps required for the point throw. If anyone has thoughts on this, please post them.
Thanks, Gary
Thanks, Gary