My brother-in-law had I have a bet..The bet is I can not build a N scale layout on a 36" x 80" hollow core door in 6 months.Well,my late wife and I build one from ground zero including 17 buildings in 30 days.So now the bet is one that I can't build one in 6 months since I have the use of one hand.
Of course I have several plans in motion..I have some N Scale buildings and Model Power has several build ups I can use.In fact the very same buildings I used on the first layout! So,one problem solved.My son will help by doing the soldering.There is no rule in the bet thatI can't get a helping"hand"as needded but,I must do 99% of the work.
Now stayed tune for a day to day progress report.
Sorry this is the picture I can take with my limited space.
Of course I have several plans in motion..I have some N Scale buildings and Model Power has several build ups I can use.In fact the very same buildings I used on the first layout! So,one problem solved.My son will help by doing the soldering.There is no rule in the bet thatI can't get a helping"hand"as needded but,I must do 99% of the work.
Now stayed tune for a day to day progress report.
Sorry this is the picture I can take with my limited space.