On the S side, I am considering extending the grade another two sections E. On the N side, there is alittle more, but I don't like to start up a grade off a curve or a turnout. I might have to drop the tracks under the bridge per ocalicreek's recommendation and then lower the bridge accordingly. I'll probably check and see what a 1/2" maximum "ditch" under the bride will do.