title was supposed to be slowly starting
ok. i am planning my layout right now. it will have a mix of bachmann ez track and atlas code 100. I hve been making my own buildings and a mountain. So far I have built a mountain/tunnel, station, cement factory, engine stall, cattle loading ramp, and i am currently working on a warehouse.
I have built the station, cement, mountain, and the warehouse on a section of cardboard. Then, i will place the cardboard sections on the layout in the correct spot.
i will try and get pics up asap.
quick question: where can i get the switches for a control board?
ok. i am planning my layout right now. it will have a mix of bachmann ez track and atlas code 100. I hve been making my own buildings and a mountain. So far I have built a mountain/tunnel, station, cement factory, engine stall, cattle loading ramp, and i am currently working on a warehouse.
I have built the station, cement, mountain, and the warehouse on a section of cardboard. Then, i will place the cardboard sections on the layout in the correct spot.
i will try and get pics up asap.
quick question: where can i get the switches for a control board?