slowing starting

Discussion in 'HO Scale Model Trains' started by HOtrainman, Jan 27, 2007.

  1. HOtrainman

    HOtrainman Member

    title was supposed to be slowly starting

    ok. i am planning my layout right now. it will have a mix of bachmann ez track and atlas code 100. I hve been making my own buildings and a mountain. So far I have built a mountain/tunnel, station, cement factory, engine stall, cattle loading ramp, and i am currently working on a warehouse.

    I have built the station, cement, mountain, and the warehouse on a section of cardboard. Then, i will place the cardboard sections on the layout in the correct spot.

    i will try and get pics up asap.

    quick question: where can i get the switches for a control board?
  2. radar

    radar Member

    atlas makes some or radio shack
  3. CAS

    CAS Member

    Someone told me about this place,, They seem to have low prices. Radio shack prices are to high, IMO. I have not ordered from them yet. But the time is soon approaching.

  4. LongIslandTom

    LongIslandTom Member

    Yeah.. Radio Shack isn't what it used to be. They are restructuring, and raising their prices by A LOT to cover the costs of keeping all those parts in stock. Over the past 5 years their prices rose by 200%+.

    These days if I want to buy electronics parts, I do it on-line. :(
  5. Torpedo

    Torpedo Member

    And it never was. They don't call it Rip Shack for nothing. :curse:

    For quantity and quality try

Share This Page