I am currently modelling an industry that requires incoming loads of paints and plastic pellets, I was wondering if anyone could either post a pic or point me in the direction of how the plastic pellets, and paint are unloaded from hoppers and tankcars into the silos that store them. I have pics of the silos themselves, and some of the pipes are there, just can't find anything about what is at trackside for unloading...Any help anyone??? I have a 2 silos for plastic and one for paint, and it is going to use the same spur track for unloading.
http://www.trainboard.com/grapevine/editpost.php?do=editpost&p=285876
http://www.trainboard.com/grapevine/editpost.php?do=editpost&p=285876