The "main line is the oval"
I insulated 1 section on the right part of the oval ( next to the pond so the train on the main line is stopped there while the switcher can do some run around on the left side of the layout
I insulated the run around track so the switcher can wait there with a few boxcars while the complete main oval will be powered.
Of course the spur is insulated too, so the switcher and 1 boxcar can wait there
Does it mak any sense ?
TIA for any suggestion and/or improvment.
I insulated 1 section on the right part of the oval ( next to the pond so the train on the main line is stopped there while the switcher can do some run around on the left side of the layout
I insulated the run around track so the switcher can wait there with a few boxcars while the complete main oval will be powered.
Of course the spur is insulated too, so the switcher and 1 boxcar can wait there
Does it mak any sense ?
TIA for any suggestion and/or improvment.