I was going through my workshop and layout room and started counting and writing down the projects that I started but haven't finished. Anyone else like this? here they are in no particular order:
1) Central valley stock car Finish assembly paint and decal Weather
2) MDC HOn3 shay rebuild
3) Retofit an unknown FP-7 shell onto an athearn chassis
4) DPM M.T. arms hotel paint, assemble, interior
5) City Classics grocery store interior
6) P2K sw1200 paint and decal
7) Add weight to freight cars on the layout.
8) DPM theatre and bar kits (gold series) add details
9) add sidwalks to my finished city areas
10) Repair reefer car that fell off my layout (ouch!)
11) Tugboat kit for the harbour assemble, paint, weather
12) Paint backdrop
13) trees (another 10 on the way)
14) Finish assembling the trestle for my logging area
15) Finish the creekbed and add water for the above trestle
16) Repair 4-6-0 tender trucks
17) Solder HOn3 logging railroad's wiring.
There's probably more but I want to finish at least 5 of these before starting any new ones. But first I have to clean the workshop....
1) Central valley stock car Finish assembly paint and decal Weather
2) MDC HOn3 shay rebuild
3) Retofit an unknown FP-7 shell onto an athearn chassis
4) DPM M.T. arms hotel paint, assemble, interior
5) City Classics grocery store interior
6) P2K sw1200 paint and decal
7) Add weight to freight cars on the layout.
8) DPM theatre and bar kits (gold series) add details
9) add sidwalks to my finished city areas
10) Repair reefer car that fell off my layout (ouch!)
11) Tugboat kit for the harbour assemble, paint, weather
12) Paint backdrop
13) trees (another 10 on the way)
14) Finish assembling the trestle for my logging area
15) Finish the creekbed and add water for the above trestle
16) Repair 4-6-0 tender trucks
17) Solder HOn3 logging railroad's wiring.
There's probably more but I want to finish at least 5 of these before starting any new ones. But first I have to clean the workshop....