Hi Guys, my trackwork on my layout requires that i make quite a few imbeded tracks in my roads and yards for truck docks on my buildings.
I am using WS Smooth It for roads, i like the stuff and it works well for me.
But how do you make the flangeways in the tracks where the crossings are so the train wheels can pass thru? Ive done it before, but the way i was doing it was crummy, i was just filling in the whole track with Smooth It and once it dried i would cut away the flageways, but this would result in huge cracks or "potholes" and crumbleing of the remaining part of the crossings between the rails and it does not look good at all lol
So how do you guys do it? Even if you guys use drywall compound, how do you make the flagways?
Thanks in advance for any help :mrgreen:
I am using WS Smooth It for roads, i like the stuff and it works well for me.
But how do you make the flangeways in the tracks where the crossings are so the train wheels can pass thru? Ive done it before, but the way i was doing it was crummy, i was just filling in the whole track with Smooth It and once it dried i would cut away the flageways, but this would result in huge cracks or "potholes" and crumbleing of the remaining part of the crossings between the rails and it does not look good at all lol
So how do you guys do it? Even if you guys use drywall compound, how do you make the flagways?
Thanks in advance for any help :mrgreen: