YouTube - Staging Test
It needs a little work still. Have to redo Track #1. You can see that it kinda kicks in a little at the very back. I apparently kicked it in a little too much and trains will overhang on track 2.
The walls will be painted on the outside and inside, track ballasted, and some caboose industry ground throws installed. Because of the way it's constructed there's no room for tortoise control.
It needs a little work still. Have to redo Track #1. You can see that it kinda kicks in a little at the very back. I apparently kicked it in a little too much and trains will overhang on track 2.
The walls will be painted on the outside and inside, track ballasted, and some caboose industry ground throws installed. Because of the way it's constructed there's no room for tortoise control.