I have WS Inclines/Risers etc. glued down. I cut WS Plaster Cloth into 4" wide short strips and applied to the top with some over both sides of them. I will use the Plaster Cloth for terrain that will "connect to the edge" of the Inclines/Risers etc next is my plan. Question: Will one layer be sufficient covering the road bed only that I have down now? I will use WS Track-Bed with Flex Track later. I'm planning on running double track [N] over the Risers etc. then ballast it. Thanks for any advice given.