I'm not sure on how to do this part.
After i fix my track and road bed down. And where i am gonna have flat land. Should i still put some plaster, or scultp-a-mold to give it some ground? I know i don't want my ground to be higher then my track/roadbed. But i don't really want a real flat surface anyway.
Thanks,
CAS
After i fix my track and road bed down. And where i am gonna have flat land. Should i still put some plaster, or scultp-a-mold to give it some ground? I know i don't want my ground to be higher then my track/roadbed. But i don't really want a real flat surface anyway.
Thanks,
CAS