The car float transfer arrives at the support yard for the operation. A Bachmann Spectrum GP 35 handles the car float loading because its my best running slow speed locomotive.
I have 2 of the four tables built already, I started on 4/8/08 and just completed frame work of 2nd table today. My plans have changed and are likely to change again if I just do one scale versus trying to have a loop of everything I havesign1 as this is my first permanant layout its purpose is to get the trains rolling down the rails and off the floor.:twisted: