Hi Y'all
After a long year of planning, I am building my bench work after the 1st of April when I get paid. I still haven't figured out the software to do track plans so it is all on graph paper.
What I am trying to figure out is how to set up the bench work itself. I have plywood bought for the top but I changed things on the layout. Now I am planning two bodies on water which I need elevation changes and I am not sure what to do. I have picture of kinda what am looking at doing. It is picture of a tv show so bare with me the quality is poor but it is he best I can do. I think if I can pull it off it will be a awesome effect.
Krawler
After a long year of planning, I am building my bench work after the 1st of April when I get paid. I still haven't figured out the software to do track plans so it is all on graph paper.
What I am trying to figure out is how to set up the bench work itself. I have plywood bought for the top but I changed things on the layout. Now I am planning two bodies on water which I need elevation changes and I am not sure what to do. I have picture of kinda what am looking at doing. It is picture of a tv show so bare with me the quality is poor but it is he best I can do. I think if I can pull it off it will be a awesome effect.
Krawler