The link at the bottom is of my proposed switching and staging yard. I was working on the wireing blocks when I came up with an idea and thought I'd run it by the experts.
Would it be practical to run two switchers on the yard, one to break down incoming trains and one to assemble outgoing trains. This would add to the action of multi person operating sessions. With two operators running trains on the mainlines (red and blue lines) as well as another one on an adjacent industrial interchange and switching yard.
I realize that it would involve a more extensive wiring setup but I would be willing to work it out if it is practical.
Yard Pic
Would it be practical to run two switchers on the yard, one to break down incoming trains and one to assemble outgoing trains. This would add to the action of multi person operating sessions. With two operators running trains on the mainlines (red and blue lines) as well as another one on an adjacent industrial interchange and switching yard.
I realize that it would involve a more extensive wiring setup but I would be willing to work it out if it is practical.
Yard Pic