Looks like I have another of many hurtles to jump over down the railroad hobbie way of life so the next task to learn... I have 4x4 feet of bench work on the right end and over 4x4 feet on the left end of the benchwork. I would like to make 2 helixes for each
end to drop the track down to 12" or more to the hidden staging yard. Are there any step by step ho to's for doing this or can I get some directions please? I included the plan for reference. The benchwork is 36" high which I'm quite happy with, and its framed with 1x4.
[]
I'm not sure if pic will go big so please ckick the link
end to drop the track down to 12" or more to the hidden staging yard. Are there any step by step ho to's for doing this or can I get some directions please? I included the plan for reference. The benchwork is 36" high which I'm quite happy with, and its framed with 1x4.
[]
I'm not sure if pic will go big so please ckick the link