I'm sure this question has been answered here before, but my searches didn't find it.
I'm building the East Terrible Mine and want to scratch build a loading dock next to the spurr track. Can anyone tell me how high the top of the dock should be above the rail?
Thanks,
Doc
I'm building the East Terrible Mine and want to scratch build a loading dock next to the spurr track. Can anyone tell me how high the top of the dock should be above the rail?
Thanks,
Doc