The new Digitrax DCC system showed up and I'm still in the process of trying to get my layout established.
What sequence has everyone found the easiest? I'm looking at a flat deck, I've layed out the track and I'm ironing all of the routes out but I can't picture how much room I'm going to need for the hillside coming down into the layout and room for roads and buildings etc. I haven't purchased all my buildings and stuff yet. Do I need to get all this together first and place in on the layout as I decide, should I draw out the roads and stuff? I'm affraid if I get the track where I want it and start attaching it I'm going to find I don't have the room I need in certain places?
I guess I'm back to the which came first the egg or chicken issue? :cry: Did they build the city first and then bring in the RR or build the RR first and put up the city afterward?
Thanks, Hook
What sequence has everyone found the easiest? I'm looking at a flat deck, I've layed out the track and I'm ironing all of the routes out but I can't picture how much room I'm going to need for the hillside coming down into the layout and room for roads and buildings etc. I haven't purchased all my buildings and stuff yet. Do I need to get all this together first and place in on the layout as I decide, should I draw out the roads and stuff? I'm affraid if I get the track where I want it and start attaching it I'm going to find I don't have the room I need in certain places?
I guess I'm back to the which came first the egg or chicken issue? :cry: Did they build the city first and then bring in the RR or build the RR first and put up the city afterward?
Thanks, Hook