I thought I better post a few pics seeing as I'm taking a break from scenery for a bit and I'm turning back to wiring .For wiring I'm just concentrating on making some kinda mile post with the numbers etched into them and placing them next to the turnouts so I will know which number to punch into the dt400 hand controler to throw the switch.
These pics are basiclly the buildings placed back on the bench work and the three diarammas put back. I also started roughing in the road ways I plan on finishing them with a sand base.
Here I roughed in the tunnel portal for now and painted it up.
couple pics of the laser cut mine I put together I redid the mine rocks , I think they look much better now , I also roughed in the 2 portals in that end and the bridge is sitting there to indicate where it will cross
The top of the mountain still needs a lot of work but I will need to make some kits first.
Here's a couple more scratch builts that seem to have found a place.
overall shot
Stuffey's brewery's also found a piece of property
My BLI with sound
Sea food is in place along with the leather factory you can see where the bridge will cross the track gorge