Hi Andrew thankyou for your help in posting my pics of layout the lights are my firist go and making them seem to come out ok the trck is all fleishmann and have 44 sets of point in use the cabling under the baseboard is my bus wire for DCC plus feeds and point motor cable i have to run another like bus lead to conect all my lights to long job ahead put getting there i think im run two lines of 38 ft per line going all around my room plus 7 x 8ft sidings and 3x 5ft sidings for engine shed off the two lines come spurd that go a terminus 6ft long with 6canopy to cover it take 1 loco plus 6 carriages next job is filling the gaps with buildings and industrie ect hope to have thing running by xmass all being well.mike