Hey People,
Okay, got my layout sorted (all track required that type of thing) and am now starting to sort out the landscape a bit.
Problem is trying to get the train up the hill to the upper level. I currently have a 1/2 meter section of track rising to about the height of 1 1/2 trains, I need about double this eventually for tunnels and things I have brought, and the little 6 wheeld diesel loco that came with the starter set just can't make it. It runs fine, but just sits with the wheels spinning about half way up unless I give it full power a little before the climb.
Is there anyway I can improve traction? If not anyone know what my options are?
Thanks in advance guys
Stu
Okay, got my layout sorted (all track required that type of thing) and am now starting to sort out the landscape a bit.
Problem is trying to get the train up the hill to the upper level. I currently have a 1/2 meter section of track rising to about the height of 1 1/2 trains, I need about double this eventually for tunnels and things I have brought, and the little 6 wheeld diesel loco that came with the starter set just can't make it. It runs fine, but just sits with the wheels spinning about half way up unless I give it full power a little before the climb.
Is there anyway I can improve traction? If not anyone know what my options are?
Thanks in advance guys
Stu