What to do?

Discussion in 'Trackside Photos & Details' started by Nomad, Oct 11, 2008.

  1. Nomad

    Nomad Active Member

    Josh, thank you. Now I know I am headed in the right direction with this.

    Stephen, thanks for the encouragement and the great ideas. They really helped!

    Brakie, if I get your meaning, that industry was rail served until it shut down and the track was pulled:mrgreen:.
    And don't worry about pushing, the voice of experience is always welcome here:yep:

  2. fsm1000

    fsm1000 Member

    Hey Nomad you are quite welcome :D
  3. Dave1905

    Dave1905 Member

    I would flip the Atlas lumber yard around and put it on the other side of the track. the side you see in the picture is the car/truck loading side. I would have that side face the backdrop and then put additional lumber sheds, storage to the right in the open space. In its current location the only way for somebody to buy lumber is to park their car/track on the tracks.

    Dave H.

Share This Page