The new MAT

Matthyro

Will always be re-membered
Dec 28, 2000
4,550
0
36
86
Georgetown, Ontario,Canada
Here is my first draft of the new N gauge MAT.
I used the RTS 5.0 freeware from Atlas to draw the layout. The blue squares are 12x12inches in size.
Minimum radius is 20 inches. I designed this trackplan to take advantage of walk around control as I like to follow my trains.
On the bottom right you will see the interchange at Sarnia where the MAT meets Catt's GVR. NARA at its best. I haven't showed where the various industries are yet.
This is a big file that takes a while to load.
Please tell me what you think of it?
MATbmp.jpg
 

shamus

Registered Member
Dec 17, 2000
3,489
0
36
87
UK
Robin, that plan looks great, plenty of scope for scenery, love the idea of a 12 stall roundhouse, sit loco's out in the sun all day!.

shamus.
 
C

Catt

Robin,I like it.:D I'm still debating on where to put the GVR/MAT interchange on my new layout.I've been thinking of a point to point so to speack with the MAT at one end and Larry's CEE at the other end,and somewhere putting a connection to Helge's Sandy River.