Peco or Micro Engineering?

Discussion in 'On30 Forum' started by hlskhill, Oct 15, 2005.

  1. hlskhill

    hlskhill New Member

    I'm about to begin my 0n30 layout and need feedback about whether to use Peco or Micro Engineering track. Also code 100 or 83? Thanks, Harvey
  2. tillsbury

    tillsbury Member

    I think Peco only make On30 track in code 100 -- if you want code 83 you'll have to use HO track... see this link here...

    Micro Engineering don't make turnouts, though...

  3. Tileguy

    Tileguy Member

    Nobody makes track that looks this great for the logging line but you can come close if you handlay your own.
    Much depends on how large your layout will be wether tackling that would be something you would want to do.
    Its the only way to get a look like this :)

    Attached Files:

  4. BobbyDing

    BobbyDing New Member

  5. wabana kid

    wabana kid New Member

    Code 83

    Hi everyone. code 100 is big to me , I am using Micro Engineering code 83 on my On30 layout. and to make turnouts really easy i have a FAST TRACKS # 5 turnouts fixture. great looking turnouts visit their website and have a look.

    wabana kid
  6. jcoop1

    jcoop1 Member

    I have the peco on30 track and switches, but having seen the ME code 83 on30 I have to say that "next" time it will be the ME even if I have to "build" the switches

Share This Page