New layout so far.

Discussion in 'Track Planning' started by rksstl, May 26, 2004.

  1. rksstl

    rksstl Member

    Heres what I have so far. walls in the room painted, bench work will start this week end. and this is what I have for the alyout design so far. 5 4'x2' mods. in N guage. I thinking in the fore ground small yard and wharehouse.

    Attached Files:

  2. Russ Bellinis

    Russ Bellinis Active Member

    It looks good so far. One change I would make is to shorten the passing siding a bit, and then make a short runaround in the industrial area on the lower left peninsula. Depending on direction you have two facing point and one trailing point switches or vice versa. To work all three from the same train you need a way to get around some of the cars to push them in.
  3. jon-monon

    jon-monon Active Member

    :thumb: :thumb: :thumb:
  4. rsn48

    rsn48 Member

    You want your doubled track to be able to take your average lengths of train. The loop on the right, double tracked doesn't look like it would hold a train length as reflected in your double track on the main, running horizontally to the screen and room.
  5. alphanumeric

    alphanumeric Member

    looks good.. also looks like something I want to plan out..

    do you think the 2ft will be good enough? I might try 2.5 feet..

Share This Page