Need help going nuts

Discussion in 'G / O / S Scale Model Trains' started by rockstars1989, Dec 23, 2012.

  1. rockstars1989

    rockstars1989 Industrial Rail Road

    I have a huge fast track layout.Have 15 remote switch tracks.Trying to add a diesel shop.Need to install a 0 72 remote switch for the entrance.When I pull an 0 72 curve track out and install a switch track in its place the comp board in the switcher instantly blows upon throwing the remote switch.All other switchers and locomotives run properly.Please help!
  2. Bill Nelson

    Bill Nelson Well-Known Member

    Can't help you with that, not familiar. that is the good thing about handlaying track, if something goes wrong; the cause is always the same I *****ed up again.

    Bill Nelson

Share This Page