bench work has started

Discussion in 'Narrow Gauge Model Railroading' started by Edavillenut, Dec 16, 2006.

  1. Edavillenut

    Edavillenut Member

    well tonight i bought the wood to start building my bench work for my On2 layout. i am going to be building it modular 30" x 48" sections. i still live with my parents so when i move it will make it easyer to take out. Pic to come tommarow:D
  2. nachoman

    nachoman Guest

    great news! can't wait for the pic!

  3. nkp174

    nkp174 Active Member

    Excellent! I've laid the track for (1) 4' section of an On3 railroad. I've drawn a billion track plans in the past 10yrs, but I've actually chosen not to develop a track plan...beyond from marking centerlines on each section.
  4. fsm1000

    fsm1000 Member

    I often suggest being able to carry ones layout for just those reasons. Very practical :)
    Hope to see pics soon [like everyone else LOL].
  5. Edavillenut

    Edavillenut Member

    yeah well the pics wont be coming too soon. i havent had time to work on it much. i have all the lumber cut. but i have been to busy trying to figure out how i want to lay everything out to really work.
  6. Edavillenut

    Edavillenut Member

    well i finaly had time to work on the bench work. heres what i got done today.
    it is an L shape the long part is 30" x 12' and the shorr part is 30" x 8'.

    tommaorw i hope to have the plywood deck on. I might be ables to start to put the wood risers on for the subroad bed.

    Also i started to design a cabinet for my Digitrax system, ac transformers for lights and a place to store some of my rolling stock. this is all being built in my 12x14' bedroom :curse: so there has to be a place for my queen bed and a work bench.

    more pics to come tommarow ( i hope)
  7. Edavillenut

    Edavillenut Member

    it would help if i put in the pic

Share This Page