As promised but better late than never

Discussion in 'Getting Started' started by Why me, Jan 5, 2007.

  1. Why me

    Why me Member

    1 Broadway F3 califorian Zphyer 3 car unit A B C all with sound pulling 5 out of its 12 carriges hope like .mike click here to see
  2. interurban

    interurban Active Member

    Well I think it`s a neat shot, and sounds great .
    Thanks for posting.

    I am surprised no one has bothered to answer your post Mike.
  3. joesho

    joesho Member

    wow wish i had a set like that, great stuff,why me
  4. Cannonball

    Cannonball More Trains Than Brains

    I watched the video earlier tonight but didn't get a chance to reply.
    Very nice train and layout! Where did you get the train from?
  5. berraf

    berraf Member

    That sure is an impressing train and it seems to run on an impressive layout too.
    Thank´s for sharing
  6. Jim Krause

    Jim Krause Active Member

    Mike: I enjoyed the video. I'm surprised that it loaded and played on my antiquated computer.
  7. Why me

    Why me Member

    I wish you could have seen my modelling skills some 3 years ago the differance in me now to then more relaxed and happy with my work its not brilliant but im no scenic guy hate with passion electronics side of it i love and yes dare i say playing train my son alvaro now 13 we have an hour a day together somtimes more as girls are about now lol but eben like to show off his layout to the girls hope he finds one with money thease broadways dont come cheap lol.mike
  8. berraf

    berraf Member

    Have fun that´s my motto!
  9. nachoman

    nachoman Guest

    please post more videos. that was fun!

  10. cnw1961

    cnw1961 Member

    Nice video, good sound and a very beautiful train. I’d like to see more :wave: .
  11. Why me

    Why me Member

    If you go to my website to the vids bit there are some more of nice train E7ABA PLUS OTHERS.MIKE
  12. Why me

    Why me Member

    I have been asked what track am i using its all felischmann ready ballast track being used some 40 lenghts of flexi 20 4th radiud curves set track 20 3rd radius curves set track 18 normal points 9left hand 9right hand 4 express points 2 right hand and 2lefft hand 1 right double slip and 1right hand crossover 2 triple points 16 point curves 18 buffer stops over all size of layout 40ft square operatinal use access from main station for tram to go up mountin scene to castle allwhen building put in place brewery working with loading and unloading goods shuntting yat with 7lines all interlocking with points thats real fun rembering the points open and closed all run on DCC lenz 100 with 2 hand held throttles but will expand to 4 soon to operate layout.alvaro

Share This Page