3.60m x 800m plus helix needs filling IN N GAUGE

Discussion in 'Track Planning' started by Why me, Oct 25, 2007.

  1. Why me

    Why me Member

    Hi guys due to ill health i have to take back my train room from HO to N scale this is ok as i now have a baseboard sixe of to decke with helix 3m.60m double decker with 12 inches of clearance in beween them but am stuck in what to fill this boards with i like bridges mountins points loads for stunnting lots of industries so can any of you nice guys help out please ty.mike
  2. Russ Bellinis

    Russ Bellinis Active Member

    If you want to do a one turn prototype helix you could model Tehachapie with the loop at one end of the layout. I think the only bridge would be the one at the top of the loop where the train goeas over itself, but it would have lots of mountains. You would probably not have a full 12 inches between levels at the loop itslef, but with a grade coming up to the loop and another one going up from the loop you could get a 12 inch separation a little bit away from the loop.

Share This Page