2 month Warning!!!!!

Discussion in 'The Caboose' started by N Gauger, Oct 31, 2007.

  1. N Gauger

    N Gauger 1:20.3 Train Addict

    sign1sign1 Don't get too upset...but.......

    There are only 2 months left in 2007!!!

    Now - The question is:

    Have you gotten all the railroad things you planned for this year finished???

    C'monnnnn I know you had expectations - I know at the beginning of Summer (or Winter) you planned to do "Something"....

    Did you do it???

    ............If not - - - there's still 2 months left..... heheheheheheheheheeeee
  2. ezdays

    ezdays Out AZ way

    "FINISHED", you have to be out of your mind.wall1 "STARTED", well, that's more like it.:twisted: I have removed most of the track, ballast and turnouts on about half my layout. I now have in my possession, all the new track, roadbed and turnouts I need to get my new track configuration finished.:thumb: I also started to carve out the lake that will now allow me to use a bridge between my movable and fixed sections of my layout.:cool: This has been a constant frustration since this is now the third time I'm redoing that.:rolleyes:

    Will I have it finished by the end of the year? I sincerely hope so. I've been sidetracked with other projects (most of which are my own doing), and a little incident with me, a bike and a curb...:eek:
  3. CNWman

    CNWman CNW Fan

    I got the foam on the table,that's all I had planned to do this year. Oh, and got at least one new engine (really got 5 more :D)
  4. nachoman

    nachoman Guest

    I don't ever plan anything, that way I am never disappointed!

  5. N Gauger

    N Gauger 1:20.3 Train Addict

    sign1sign1sign1 Mee Too!! I can't plan any further than a couple days ahead... :) I did get the track fixed though - I planned that since March.. Just did it a few weeks ago :eek::eek::eek:
  6. Pitchwife

    Pitchwife Dreamer

    :rolleyes::rolleyes::rolleyes::rolleyes: You've got to be kidding! :nope::nope::nope::nope: I haven't even figured out where to put the stuff that is stored in the space where my planned layout is going to go. wall1wall1 I'd have a yard sale, but I doubt that I could even give the stuff away. Can you say PACKRAT? hamrhamr
  7. N Gauger

    N Gauger 1:20.3 Train Addict

    I had that stuff too... I put it all under the layout hehehehehe

    just built the layout right over the "stuff" sign1sign1sign1sign1
  8. ezdays

    ezdays Out AZ way

    Uhh, I didn't read this too carefully, you said "planned". You gotta define that a bit better. Do you mean "intended" or does that simply mean, "thinking about it"? And if it is, "thinking about it", then we have to go further and ask, "seriously thinking" or "just dreaming"?sign1 sign1 sign1 sign1
  9. eightyeightfan1

    eightyeightfan1 Now I'm AMP'd

    Yeah! I got a lot done.
    lets see I ...No....ran out of paint that my LHS doesen't stock anymore.
    Started to ....Nope.....Didn't get finished.
    Well, there's that........Uh...Uh......Not even close....Honey-Do list came first

    Guess not..........
  10. MCL_RDG

    MCL_RDG Member

    Tomorrow maybe the day after...

    ...the last day of your life.

    announce1And tomorrow the mortgage is due:goldcup:.


    Oh yeah- Happy Halloween~~~~~~~~~~~~~~~~~~~~
  11. 60103

    60103 Pooh Bah

    Was there a thread somewhere where we listed things we were gonna do this year? or was that last year? Can I go back and remove it?
  12. N Gauger

    N Gauger 1:20.3 Train Addict

    sign1sign1 I don't think there was... but i cant remember October, let alone January!! :eek::eek:sign1sign1sign1
  13. Pitchwife

    Pitchwife Dreamer

    If I did that I'd need a stepladder just to poke my nose over the edge. sign1sign1
  14. N Gauger

    N Gauger 1:20.3 Train Addict

    I guess it would be a shelf layout then :eek::eek::eek::eek:
  15. green_elite_cab

    green_elite_cab Keep It Moving!

    I have gotten very little completed that i wanted to. Maybe a few structures. However, i Aquried things i wouldn't have even dreamed of finding. In these past few months, i got two Rare American GK E60CP kits (which are now becoming awesome E60CH/E60MA models), and just tonight i won an Alco Brass Models E-44 Electric locomotive, so now i'm pretty much as happy as possible.

    I never even imagined finding a r-t-r model of that, and i definitely did not want to build one from an E33 (shudder).

    So many of the things i do have done were not planned, and even though more of my top goals were missed so far, i'm still much farter along then i ever expected.

    Oh yes, I shop victoriously, although i think Ebay may be a cause of heart attacks. How many of us have ever sat there in the last second and expected to be beat? I've done that alot this year... no good!


    Ralph, should i leave it how it is, or CR patch it?
  16. mooreway

    mooreway Member

    We finally got around to building the first bridge on our outdoor layout. it crosses over a man-made spillway that will help eliminate some drainage problems we have had to this point. It isn't much but it is a start. We hope to get much done on the 1:29 MooreWay and Lizard Gulch in the next two months now that the weather is nice.
  17. N Gauger

    N Gauger 1:20.3 Train Addict

    Nice!! That's a neat little bridge! :D :) :D :)
  18. Pitchwife

    Pitchwife Dreamer

    Not only that, I don't believe that I would have the NMRA minimum clearance between track and ceiling, and we are talking about an N scale layout. :eek: :eek: :eek: :cry: :cry: :cry:
    Sorry for the off topic post, I just couldn't help myself. sign1sign1
  19. RonP

    RonP Member of the WMRC

    i got DCC thats all i had planned
  20. MadHatter

    MadHatter Charging at full tilt.

    OH NO!!!! I need to finish my portable layout- then I've at least accomplished one of the hings I set out to do!

Share This Page