Kato Unitrack Truss Bridge Bash

enwhycentral

New Member
Dec 9, 2007
2
0
1
A long time ago (7 years or so) a member of this forum named UPGuy posted on this forum a short explanation of how he went about shortening a Kato Unitrack truss bridge. I am about to attempt the same thing with a double track version and wonder if anyone can provide me with any more details about the procedure and what pitfalls to avoid. I am particularly interested in how to deal with the end sections of the bridge where the rails pass through the section just before where the Unijoiners are attached. Any help you can provide would be greatly appreciated.

Larry Weinberg
enwhycentral @optonline.net
 

TrainGuyRom

New Member
Apr 27, 2008
75
0
6
Madison WI
I do not know much about that track, but I think your best option or shortening the bridge it to cut a section out of the center of the bridge, put normal rail joiners to connect the to pieces & glue(with plastic glue) the deck & truss together.

as I said I do not know much about Kato Unitrak, so don't take what I am saying as gospel.

hope I helped
TGR
 

upguy

Oregon Western Lines, CEO
Jan 26, 2001
380
0
16
77
Canyon City, Oregon, USA
http
I haven't looked in on The Gauge for a long time, but today I decided to do a little more work on the scenery surrounding the modified Kato bridge that is mentioned in this thread. This is a picture of the bridge as it was when I finished today.
 

Attachments

  • DSCN1574.jpg
    DSCN1574.jpg
    114.9 KB · Views: 21

Denyons

Member
Nov 2, 2006
100
0
16
85
Sherwood Park,Alberta, Canada
Kato Unitrack Bridge

Re. shortening a Kato Unitrack truss bridge.
Larry Weinberg

Not sure about shotening the bridge but on my layout I believe that I just pulled off the Unitrack clips and installed it with the usual rail joiners.
Denyons
 

Attachments

  • Fast flowing river.jpg
    Fast flowing river.jpg
    201 KB · Views: 18

enwhycentral

New Member
Dec 9, 2007
2
0
1
Kato Bridge Bash Redux

I haven't looked in on The Gauge for a long time, but today I decided to do a little more work on the scenery surrounding the modified Kato bridge that is mentioned in this thread. This is a picture of the bridge as it was when I finished today.

UPGUY,
Your bridges looked great 8+ years ago and they still do! Your post brightened up my day considerably, since I thought I was the only laggard when it came to finishing projects. My own Kato bridge bash, which I started about 2 years ago hasn't been worked on for well over a year. It's still only about 75% complete and still needs cables, sheaves, walkways, a bridge tender's structure and painting and detailing. The bridge was scratch built from basswood and styrene upon 3 double track Kato truss bridge decks. I decided not to use any of the other structural components of the bridge as I custom designed the truss.
ENWHYCENTRAL
 

Attachments

  • The Bridge-1.JPG
    The Bridge-1.JPG
    124 KB · Views: 17

upguy

Oregon Western Lines, CEO
Jan 26, 2001
380
0
16
77
Canyon City, Oregon, USA
http
This is the look of the bridge area as it was left over the weekend. Tuesday, I expect to give it another coat of paint and maybe try to work the mountains into the layout background. I should have taken some picture of the area so I would have a "real life" look to the background. Instead, I'll just paint some hills and hope that my memory of the area is good enough...(that's a really huge expectation).
 

Attachments

  • DSCN1594.jpg
    DSCN1594.jpg
    143.8 KB · Views: 21